6382-KOLPABlind

in Mechanical Engineering held by boruts
Contest Ended, Winner(s) have been selected.
  • Open
  • Choosing Finalist
  • Ended
Description:
COLPOLY 7321 POL distribution system
Wants:
Clear and presentable P&ID based on existing solution - 3D plant model for upgrade procedure in the future.
Software:
  1. AutoCAD Plant 3D (2023)

Entries

= Buyer's Rating

Discussion

Tue, 12 Dec 2023 14:35:14 +0000
Please provide this drawing screen shot in English.
Sun, 10 Dec 2023 15:46:55 +0000
I HAVE EXPERIENCE IN THIS FIELD AND I CURRENTLY WORKING ON THIS PROJECT
PLEASE CONTACT ME
8368994712
shivamsoni8845@gmail.com
Fri, 08 Dec 2023 05:41:29 +0000
Hallo, verzeihen Sie mir, meine Muttersprache ist Englisch. Ich bin an Ihrem Vorschlag interessiert und kann Ihnen ein 3D-Modell zur Verfügung stellen, aber in welchem ​​Format möchten Sie die Datei haben? Ich sollte in der Lage sein, die Datei in jedem gewünschten Format bereitzustellen. Bitte kontaktieren Sie mich unter Ryanjacques02@gmail.com. Standardmäßig würde ich die Datei als AutoCad Plant-Datei bereitstellen.
Thu, 07 Dec 2023 09:36:04 +0000
Please contact me cemalldr@gmail.com
Sun, 03 Dec 2023 07:56:45 +0000
Definitive.drafting.design@gmail.com

mechalover

Designer

Fri, 01 Dec 2023 06:19:31 +0000
did i can do it on AutoCAD mechanical 2022;
Fri, 01 Dec 2023 02:50:36 +0000
Contact me abhinav7052@gmail.com
Thu, 30 Nov 2023 13:39:10 +0000
#increase_prize
Thu, 30 Nov 2023 12:23:26 +0000
contact me at ashrafwaly2015@gmail.com
Wed, 29 Nov 2023 23:59:36 +0000
Whatsapp +14408806487
Please contact me.

Similar Contests on Cad Crowd

FEA thermal analysis
Need temperature profiling for brake rotor during brake engagements. Initial rpm=100, final =0. Brake force = 3Mpa. Air flow = radially
Statistical Analysis of Discrete (Building Construction) & Simulation/Animation
I want to model (statistical modeling & analysis, and/or simulation/animation) discrete events, specifically, construction workers preparing, welding, soldering, threading and installing small hydronic pipes vs. large pipe. Because large pipe require different materials handling techniques, tools and equipment, supports for installation, I want to model both small and large pipe installations and study time and cost required, and conclude whether installing small pipes (ranging from 3/8" to 2-1/2") vs large (3" to 22" pipe) runs more smoothly, time-wise, how much more resources are required? Parameters are given.
Perforation Machine
We are in the process of designing a very low cost perforation machine. We need to get the machine design done
Mould making technical information
We have drawings of a product we would like to produce, 3d drawings and renderings have Ben produced, we require the technical information for the manufacturer to produce the mould and the final product as per our requirement.
Roller Conveyor Shot Blasting Machine
The scope of work includes complete designing of machine along with BOM and manufacturing drawings. The candidate has to work with the Design Head of the company. Reference data / similar other machine design data will be made available and the candidate has to start working with that reference.