This project aimed to mitigate the hazard posed by annual flooding at the bottom of Bartlett Hill Road in Cambridge, VT. This roadway design was created to calculate the cost feasibility of extending Bartlett Hill Rd, which is currently a dead-end road, by utilizing an abandoned stretch of road that is washed out and very steep but connects to an adjacent road.