Developed many elements of a wheelchair accessible (universal access) toilet cabin (UAT). I worked with a small team to develop the whole of the cabin using sheet metal, composites, and aluminium castings. I designed all of the electrical and control system to meet Rail Standards, PRM requirements and legislation, as well as passenger comfort and train maintenance needs. I developed the test plan and carried out the testing to ensure compliance with EMC, Shock & Vibration and Environmental standards. I also carried out cycle testing on the door mechanism and control system in order to identify any weaknesses and determine the maintenance regime. I managed the simulated tests carried out on the cabin structure to ensure compliance with GM/RT 2100. I managed the EN 45545 compliance matrix and liased with suppliers and third part test house to carry out the fire, smoke and toxicity testing of necessary components.
The product was deemed to meet all UK and EU Rail specifications. The company selling the product won contracts to install the cabins into many different types of rolling stock in the UK - over 300 units supplied and installed.