About
I am a PMP Certified Planner having more
than 7 years of experience in project
planning, scheduling, monitoring and
control, extension of time, change control
system, forensic delay analysis, cost claims,
variations mitigation plans, resource
management and dispute resolution gained
on a variety of construction, civil
engineering projects like buildings, roads /
infrastructures and hydropower as well
while working in Qatar and Pakistan
Experience
-
Planning Engineer
Redco International ·
Aug 2017 –
Present
7 yrs 4 mos
Doha
• Preparation and Submission of baseline schedule / recovery schedules.
• Reviewing the Subcontractor’s schedules and claims/variations.
• Preparation and Submission of Daily, Weekly or Monthly progress reports with respect to cash flow, percentage and actual resource utilization against budgeted resources.
• Tracking the project progress, performing earned value analysis design progress and procurement especially long lead items and raising flag for any delays.
• Performed Delay Analysis (Time Impact Analysis) for Extension of Time (EOT).
• Implementing change control system, identifying deviations from scope/specifications thereby submitting variations, claims, prolongation cost and acceleration cost.
• Contractual letter drafting and communication to all stakeholders at all levels under project manager’s supervision.
• Prediction of possible risks involved in a project, preparing risk register and action plan for each risk.
• Coordinating with other Contractor’s to work in shared access.
• Tracking the project close out documentation.
-
Planning Engineer
Hajvairy Group of Companies Pvt Ltd ·
May 2017 –
Aug 2017
3 mos
Pakistan
• Planning and Scheduling of activities related to dam, power house, headrace & tailrace tunnel and other components of hydropower project with complete resource loading.
• Preparation of Daily, Weekly and Monthly Progress Reports.
• Prepared Time & Cost Claim due to land acquisition issues from Client.
• Tracking of the project activities and calculation of SPI for the progress.
• Prepared method statements for construction of access road to DAM site.
-
Planning Engineer
Bin Nadeem Assoicates Pvt Ltd. ·
Sep 2013 –
May 2017
3 yrs 8 mos
Pakistan
• Submission of resource loaded programme of works.
• Developed Traffic Management/Control & Traffic Operational Plans to execute construction activities in moving traffic.
• Preparation and Submission of Daily, Weekly or Monthly progress reports with respect to cash flow, percentage and actual resource utilization against budgeted resources.
• Coordinate, review and approve the corrective actions and recovery plans undertaken to optimize the occurred delay in order to correctly drive and lead the progress to ensure project completion in a timely & costly manner.
• Defined the Construction Methodology and Strategy for the Project.
• Calculated teams and resources required for Carriageway, Interchanges and Bridge Extension works to meet the contractual timeline.
• Developing work methodologies and productivity sheets for all activities.
• Monitoring work according to baseline schedule and attending meeting with contractor to enhance production.
• Developed document for Quality Control on site.
• Tracking, monitoring and forecasting progress of all activities and deliverables.
Education
-
University of Engineering and Technology, Taxila
BSc Civil Engineering, Civil Engineering, A
2008 – 2012
Licenses & Certifications
-
Project Management Professional (PMP)
Project Management Institute
Aug 2018 –
Aug 2021