Global rank:
32,606 / 90,337
Skill pts: 0

About

I am a very good pipe stress analyst; which is what I do at the moment.
My tasks includes but not limited to: - pressure design, vibration analysis, flange leakage check, NEMA calculations for compressors, nozzle check for equipment (static & rotating), special items verification, buried pipe calculations, static, thermal & support loads calculations, material verification (metals and non-metals), etc.
I am conversant with all relevant ASME, DNV, ISO, API, BS, EN, DIN and NORSOK codes; as well as PED 97/23/EC & AD2000.
I am also a petroleum engineer(MSc.) with good technical understanding of upstream activities (geology, geophysics, reservoir, drilling, production). I have very good knowledge & understanding of mathematics, physics, mechanics, hydraulics, process systems, subsea and marine technology.
I have also completed an MSc. in Physics & Mathematics.

Experiences:
Dec. 2019 – April 2020.
Project: Brage Field development Project (Onshore)
Client: Wintershall Dea, Norway
Stress verification/analysis to design flowlines, water and gas injection lines, drain lines and other utility lines connected to the wellheads on the Brage platform to extend the life of the field. Selecting the appropriate supports that will also prevent clashes in the congested wellhead areas amongst installed piping.

Feb. 2018 – Nov. 2019.
Project: Kårstø Gas Plant Improvement Project (Onshore)
Client: Statoil/Gassco, Norway
Stress verification/analysis to assist in the maintenance jobs at the Kårstø gas plant supervised by Aibel AS (engineering contractor for the project)

July 2016 – Aug. 2017.
Project: LPG (Liquefied Petroleum Gas) Pipeline Project.
Client: Petromax Ltd, Bangladesh.
Stress verification/analysis and documentation of an LPG pipeline from the jetty to the LPG bottling plant and down to the Petromax refinery. This also included connections of the pipeline to the existing refinery piping systems.

Sept. 2014 – May 2015.
Project: BP Ula Projects Cat B
Client: BP, Norway.
Stress verification/analysis and documentation of piping systems on the flare system on ULA platform.

Feb. 2013–Sept. 2014.
Project: Eldfisk II Modification
Client: Conoco Phillips, Norway
Stress verification/analysis and documentation of piping systems on platforms 2/7A, 2/7B & 2/7E.

Nov. 2011– Feb. 2013
Project: Mopustor Yme Field Re-developement
Client: Talisman, Norway
Stress verification/analysis of piping within and around the wellhead area of the Mobile Offshore Production Unit & Storage facility to be used for the YME field re-development.

Jun. 2011 – Nov. 2011.
Project: Draugen/Ormen Lange/Snorre
Client: Shell / Statoil, Norway.
I'm back to the Shell NISC projects (Draugen/ Ormen Lange); doing all jobs related to stress analysis, verification & documentation. I am also doing the same on the Statoil Snorre V & M project when the need arises. This is a split location roll between the two projects.

Aug. 2010 – Jun. 2011
Project: Tampen/Snorre V & M
Client: Statoil, Norway
Worked with stress analysis and documentation on modification projects.

May 2010 – Aug. 2010.
Project: Ormen Lange.
Client: Shell, Norway.
Performed verification of stress analysis calculations for the Ormen Lange Subsea Compression Test-Site Facility.

April 2008 - April 2010
Project: Statfjord late life
Client: Statoil, Norway
Started as a trainee engineer in Aker Solutions under the piping stress group in the Statfjord Late Life project. Trainee period lasted six months.

Jun. 2007 – Aug. 2007
Pipeline & Products Services, Halliburton Norge AS (Onshore)
Location: Tananger - Norway
Summer intern. Assisted in the repair and maintenance of different types of pumps, cementing units, air compressors and various hydraulic units used offshore.

Mar. 2006 – Aug. 2006
Nigerian National Petroleum Corporation (NNPC) (Onshore)
Location: Lagos - Nigeria
Worked as an attache engineering staff. Managed drilling and production data of all active oil fields under Product Sharing Contract licenses. Presented weekly and quarterly report of production and drilling activities. Participated in technical evaluation of oil service companies bidding for contracts which are under the jurisdiction of the Nigerian National Petroleum Corporation.

Oct. 1995 – Mar. 1999
Farmer & Rice-mill operator, Self employed
Location: Ajaokuta, Kogi State, Nigeria.

Languages
English, Fluent oral/written communication
Russian, Fluent oral/good communication
Norwegian, Some good oral/some written communication

Professional Membership:
1) Institute of Engineering and Technology, UK
2) Association of Professional Engineers & Geoscientists of Saskatchewan, Canada.

Software knowledge:
Microsoft office, Maurer Technology® drilling software package, Landmark® drilling software package, GAP, Prosper, AutoCAD, Maple, R, Mathlab, Pascal, Caesar II, PDMS, MicroStation, Ansys, Hys, PETREL, STAAD, SAP, ProArc.

Stats

Joined: May 12, 2020

Location

Sandnes, Rogaland, Norway