110 Ton Transporter

The client wanted a transporter that can move track vehicles faster than they can move on their own, to be able to get the mining equipment away from the face before blasting. The prototype was build in 2000 and improved the efficiency at the face between blasts by 60% There are currently 4 in operation.
Published
manufacturing-design mining design-3d manufacturing-drawing