DESIGN DETAILS:
For this project the customer required a tub filling station that met all A3 standards and the client’s stringent in house micro standards. Additionally this station would require the incorporation of dual holding tanks to assist in rapid product change over’s. Finally the complete system must be CIP/SIPed without operator intervention.
WHAT OUR TEAM PROVIDED:
Design Validation Against 3A Standards
Complete System Assembly Drawings
Complete Piping Isometrics
Process Safety Review and Validation
Station Integration with Current Line