About
Sherif Mohamed Abd El-Nour Abd El-Magid
Piping Designer
Sr. Cad Designer
_________________________________________________________________________________
OBJECTIVE:
Seeking a Challenging Career in a Petroleum (Oil & Gas) or Construction Company Whereby My Designing and Drafting Background, Previous Work Experience,
and Managerial Skills can be Applied.
PERSONAL INFORMATION:
Date of Birth: 17-1-1970
Address: 20 Mohamed El-Sayed Hyba from Abu El-Fadel St.,
El-Zawia El-Hamra, Cairo. Egypt.
Military Status: Finished
Marital Status: Married
Nationality: Egyptian
Religion: Moslem
EDUCATION:
Diploma of Industrial Technicality, Mataria Institute of Industrial Technique
Department: Mechanical
Graduation Date: May 1992
Overall Grade: Good
LANGUAGE SKILLS:
Arabic: Mother tongue
English: Very good command of both written and spoken
PROFESSIONAL SKILLS:
Familiarity with International codes & standards.
18 YEARS EXPERIENCE IN THE FIELD OF MECH. WORKS DESIGN
AND DRAFTING INCLUDES:
EQUIPMENT ORIENTATION (following Data Sheets).
PIPING ROUTING (following P& ID's) FOR EQUIPMENT
SUCH AS PRESSURE VESSELS, TANKS, TOWERS,
EXCHANGERS AND PUMPS.
SITE LAYOUTS AND PLOT PLANS DRAWINGS.
PLANS, SECTIONS & DETAILS DRAWINGS.
SHOP DRAWINGS.
ISOMETRICS AND BILL OF MATERIALS.
MECHANICAL DRAWINGS FOR MACHINE ROOMS.
UNDERGROUND DRAINAGE NETWORKS.
TREATMENT STATIONS.
ANIMATION FOR MORE DETAILS AND REPRESENTATION.
______________________________________________________________________________________
COMPUTER SKILLS:
· Very good Knowledge of Computer Hardware.
· Very good Knowledge of Various Operating Systems (DOS / Windows )
· Very good Knowledge of Many Applications Running Under
Microsoft Windows (Including Microsoft Office Applications).
· Very good Knowledge of PDS system.
· Very good Knowledge of PDMS system.
· Very good Knowledge of Smartplant Review.
· Very good Knowledge of ORTHOGEN.
· Very good Knowledge of MICROSTATION Program (2D - 3D).
· Excellent Knowledge of AutoCAD Program (2D - 3D).
· Very good Knowledge of CADWorx Application.
· Good Knowledge of AutoPLANT Application.
· Good Knowledge of PlantSpace Application.
______________________________________________________________________________________
WORK EXPERIENCE :
I WORK FOR CB&I Lummus L.L.C.
Position : Sr. PIPING DESIGNER & LEAD CAD DESIGNER
Dec. 2010 – Present
Member of Reficar project design group
( PDS , ORTHOGEN, MicroStation & AutoCAD ).
Tasks Accomplished Included:
· Preparing 3D-Equipment Models (following Data Sheets).
· Preparing 3D-Piping Models (following P&ID).
· Preparing Supports in Models for Stress Analyses review.
· Extract and Check ISO's.
· Coordinate with Process Dep. To reroute lines according to P&ID updates.
· Coordinate with Stress Analyses to achieve optimum supporting and routing as possible.
TEAM LEADER
Tasks Accomplished Included:
· Extract 2D by DRAWING MANAGER MODULE.
· PRODUCE DWG & DGN FORMATS WITH ORTHOGEN.
· FINISH AND COMPLETE 2D WITH FULL DATA AND DETAILS
by AutoCAD & MicroSTATION.
I WORKED FOR CB&I Houston
Position : Sr. PIPING DESIGNER
July 2010 – Dec. 2010
Member of Reficar project design group ( PDS , Microstation & AutoCAD ).
Tasks Accomplished Included:
· Preparing 3D-Models by PDS (included P&ID and Data Sheets).
· Clash Check Reports.
· Extract ISO's
· Extract 2D with DWG & DGN formats by ORTHOGEN.
· FINISH DRAWINGS WITH FULL DATA AND DETAILS.
I WORKED FOR CB&I Lummus L.L.C.
Position : Sr. PIPING DESIGNER
Aug. 2007 –July 2010
Participated in NAGARJUNA project (PDMS & AutoCAD).
Tasks Accomplished Included:
Member of NAGARJUNA Project team, Participated in Preparing the Modeling as following:
- Check Conditions for lines to update from latest Line List.
- Check Clashes for lines to release it from Model.
- Coordinate with Stress Analyses to achieve optimum
supporting and routing as possible.
- Coordinate with Process Dep. To reroute lines according to
P&ID updates.
- Coordinate with Instrumentation Dep. To update Sets and
Hook-Up’s.
- Coordinate with Electrical Dep. To arrange locations of
Lighting Devices.
- Extract ISO’s for Checking.
______________________________________________________________________________________
I WORKED FOR HEAVY ENGINEERING INDUSTRIES AND
SHIPBUILDING CO. (K.S.C)
Position : PIPING DESIGNER
Apr. 2006 – Jun 2007
PARTICIPATE IN SEVERALJOBS FOR K.O.C
Tasks Accomplished Included:
· Preparing Equipment Orientation.
· Preparing Equipment Piping.
· Preparing Piping Routing.
· Preparing Pipelines Networks.
· Preparing Mechanical Drawings & Details.
· Plot Plans.
· Site Layouts.
· Piping Plans & Sec's.
· Piping Isometrics & MTO.
· 3D View Perspective.
· Modeling & ISOgen.
____________________________________________________________________________________
I WORKED FOR SIEMENS Industrial Solutions and Services .
Position : PIPING DESIGNER
Sep. 2004 – Mar. 2006
Participated in EAST DELTA piping treatment project
And other Electromechanical Projects
Tasks Accomplished Included:
· Preparing Mech. & Piping Works.
· Preparing SECTIONS & DETAILS.
· Preparing ROUTING OF PIPING NETWORKS.
· Preparing ISOMETRICS & MTO.
· Preparing SHOP DRAWINGS.
______________________________________________________________________________________
I WORKED FOR SAUD CONSULT EL KHOBAR.
Position : CAD SUPPORT
Mar. 2003 – Feb. 2004
Participated in KHAFJI project for ARAMCO
Tasks Accomplished Included:
· Preparing DRAWING PLANS.
· Preparing SECTIONS & DETAILS.
· Preparing ISOMETRICS & MTO.
· Preparing SHOP DRAWINGS.
· Repairing and Converting for DGN & DWG files.
· Trainer ( MicroStation ).
______________________________________________________________________________________
I WORKED FOR ENPPI
Position : PIPING DESIGNER
May 2001 – Mar. 2003
Participated in Several Petroleum & Industrial Projects
Tasks Accomplished Included:
· Preparing Equipment Orientation & Piping (Vessels, Towers, Tanks, etc.).
· Preparing Piping Routing for Networks.
· Preparing Modeling.
· Preparing Mechanical Drawings for Pump Stations.
· Preparing Shop Drawings & Details.
· Plot Plans.
· Site Layouts.
· Piping Plans.
· Piping Isometrics & MTO.
_____________________________________________________________________________________
I WORKED FOR ABB petroleum
Position : PIPING DESIGNER & Sr. MECH. DRAUGHTSMAN
Apr. 2000 – Apr. 2001
Participated in ACPA project
Jobs Accomplished Included under & above ground:
· Preparing Underground Oily Piping Design System.
· Preparing Details.
· Preparing Piping General Arrangement of Tanks Farm.
· Preparing Piping Isometrics & MTO.
______________________________________________________________________________________
I WORKED FOR ZUHAIR FAYEZ Misr
Position: MECH. DRAUGHTSMAN
Jan. 98 - Apr. 2000
Participated in many of Electromechanical Projects
Tasks Accomplished Included:
· Preparing DRAWING PLANS.
· Preparing SECTIONS & DETAILS.
· Preparing ISOMETRICS & MTO.
· Preparing IRRIGATION SITE LAYOUTS.
______________________________________________________________________________________
I WORKED FOR SAUD CONSULT Misr
Position: MECH. DRAUGHTSMAN
Jan. 96 - Dec. 97
Participated in many of Electromechanical Projects
Tasks Accomplished Included:
· Preparing DRAWING PLANS.
· Preparing SECTIONS & DETAILS.
· Preparing ISOMETRICS & MTO.
· Preparing SHOP DRAWINGS.
· Preparing 3D-DRAWINGS.
______________________________________________________________________________________
I WORKED FOR GARNO Misr
Position: PIPING, MECH. DRAUGHTSMAN
Jan. 95 - Dec. 95
Participated in KHARGA treatment stations
Tasks Accomplished Included:
· Preparing DRAWING PLANS.
· Preparing SECTIONS & DETAILS.
· Preparing ISOMETRICS & MTO.
· Preparing SHOP DRAWINGS.
· Preparing 3D-DRAWINGS.
______________________________________________________________________
Time Before
I Worked For Different Companies As a Beginner Under Training.
______________________________________________________________________