About

Sherif Mohamed Abd El-Nour Abd El-Magid                            
Piping Designer
Sr. Cad Designer
 _________________________________________________________________________________
  OBJECTIVE:
Seeking a Challenging Career in a Petroleum (Oil & Gas) or Construction Company Whereby My Designing and Drafting Background, Previous Work Experience,
and Managerial Skills can be Applied.
 
PERSONAL INFORMATION:
Date of Birth:     17-1-1970
Address:             20 Mohamed El-Sayed Hyba from Abu El-Fadel St., 
    El-Zawia El-Hamra, Cairo. Egypt.
Military Status: Finished
Marital Status:  Married
Nationality:        Egyptian
Religion:             Moslem
 
EDUCATION:
Diploma of Industrial Technicality, Mataria Institute of Industrial Technique
Department:             Mechanical
Graduation Date:     May 1992
Overall Grade:         Good
 
LANGUAGE SKILLS:
Arabic:  Mother tongue
English: Very good command of both written and spoken
 
 
 
 
PROFESSIONAL SKILLS:
 

Familiarity with International codes & standards.

 

18 YEARS EXPERIENCE IN THE FIELD OF MECH. WORKS DESIGN

            AND DRAFTING INCLUDES:

EQUIPMENT ORIENTATION (following Data Sheets).
PIPING ROUTING (following P& ID's) FOR EQUIPMENT

SUCH AS PRESSURE VESSELS, TANKS, TOWERS,
EXCHANGERS AND PUMPS.

SITE LAYOUTS AND PLOT PLANS DRAWINGS.
PLANS, SECTIONS & DETAILS DRAWINGS.
SHOP DRAWINGS.
ISOMETRICS AND BILL OF MATERIALS.
MECHANICAL DRAWINGS FOR MACHINE ROOMS.
UNDERGROUND DRAINAGE NETWORKS.
TREATMENT STATIONS.
ANIMATION FOR MORE DETAILS AND REPRESENTATION.

______________________________________________________________________________________
 
COMPUTER SKILLS:
 
·         Very good Knowledge of Computer Hardware.
·         Very good Knowledge of Various Operating Systems (DOS / Windows )
·         Very good Knowledge of Many Applications Running Under
Microsoft Windows (Including Microsoft Office Applications).
·         Very good  Knowledge of PDS system.
·         Very good  Knowledge of PDMS system.
·         Very good  Knowledge of Smartplant Review.
·         Very good  Knowledge of ORTHOGEN.
·         Very good Knowledge of MICROSTATION Program (2D - 3D).
·         Excellent Knowledge of AutoCAD Program (2D - 3D).
·         Very good Knowledge of CADWorx Application.
·         Good Knowledge of AutoPLANT Application.
·         Good Knowledge of PlantSpace Application.
 
______________________________________________________________________________________
 
 
 
 
 
 
 
 
 
 
WORK EXPERIENCE :
 
I WORK FOR CB&I Lummus L.L.C.
Position : Sr. PIPING DESIGNER & LEAD CAD DESIGNER
Dec. 2010 – Present
Member of Reficar project design group
( PDS , ORTHOGEN, MicroStation & AutoCAD ).
Tasks Accomplished Included:
·         Preparing 3D-Equipment Models (following Data Sheets).
·         Preparing 3D-Piping Models (following P&ID).
·         Preparing Supports in Models for Stress Analyses review.
·         Extract and Check ISO's.
·         Coordinate with Process Dep. To reroute lines according to P&ID updates.
·         Coordinate with Stress Analyses to achieve optimum supporting and routing as possible.
 
TEAM LEADER
Tasks Accomplished Included:
·         Extract 2D by DRAWING MANAGER MODULE.
·         PRODUCE DWG & DGN FORMATS WITH ORTHOGEN.
·         FINISH AND COMPLETE 2D WITH FULL DATA AND DETAILS
            by AutoCAD & MicroSTATION.
 
 
I WORKED FOR CB&I Houston
Position : Sr. PIPING DESIGNER
July 2010 – Dec. 2010
Member of Reficar project design group ( PDS , Microstation & AutoCAD ).
Tasks Accomplished Included:
·         Preparing 3D-Models by PDS (included P&ID and Data Sheets).
·         Clash Check Reports.
·         Extract ISO's
·         Extract 2D with DWG & DGN formats by ORTHOGEN.
·         FINISH DRAWINGS WITH FULL DATA AND DETAILS.
 
 
 
 
 
 
 
 
I WORKED FOR CB&I Lummus L.L.C.
Position : Sr. PIPING DESIGNER
Aug. 2007 –July 2010
Participated in NAGARJUNA project (PDMS & AutoCAD).
Tasks Accomplished Included:
Member of NAGARJUNA Project team, Participated in Preparing                                     the Modeling as following:
- Check Conditions for lines to update from latest Line List.
- Check Clashes for lines to release it from Model.
- Coordinate with Stress Analyses to achieve optimum
   supporting and routing as possible.
- Coordinate with Process Dep. To reroute lines according to  
   P&ID updates.
- Coordinate with Instrumentation Dep. To update Sets and
   Hook-Up’s.
- Coordinate with Electrical Dep. To arrange locations of
   Lighting Devices.
- Extract ISO’s for Checking.
______________________________________________________________________________________
 
I WORKED FOR HEAVY ENGINEERING INDUSTRIES AND
SHIPBUILDING CO. (K.S.C)
Position : PIPING DESIGNER
Apr. 2006 – Jun 2007
PARTICIPATE IN SEVERALJOBS FOR K.O.C
Tasks Accomplished Included:
·          Preparing Equipment Orientation.
·          Preparing Equipment Piping.
·          Preparing Piping Routing.
·          Preparing Pipelines Networks.
·          Preparing Mechanical Drawings & Details.
·          Plot Plans.
·          Site Layouts.
·          Piping Plans & Sec's.
·          Piping Isometrics & MTO.
·          3D View Perspective.
·          Modeling & ISOgen.
____________________________________________________________________________________
 
 
 
I WORKED FOR SIEMENS Industrial Solutions and Services .
Position : PIPING DESIGNER
Sep. 2004 – Mar. 2006
Participated in EAST DELTA piping treatment project
And other Electromechanical Projects
Tasks Accomplished Included:
·           Preparing Mech. & Piping Works.
·           Preparing SECTIONS & DETAILS.
·           Preparing ROUTING OF PIPING NETWORKS.
·           Preparing ISOMETRICS & MTO.
·           Preparing SHOP DRAWINGS.
______________________________________________________________________________________
 
I WORKED FOR SAUD CONSULT EL  KHOBAR.
Position : CAD SUPPORT
Mar. 2003 – Feb. 2004
Participated in KHAFJI project for ARAMCO
Tasks Accomplished Included:
·           Preparing DRAWING PLANS.
·           Preparing SECTIONS & DETAILS.
·           Preparing ISOMETRICS & MTO.
·           Preparing SHOP DRAWINGS.
·           Repairing and Converting for DGN & DWG files.
·           Trainer ( MicroStation ).
______________________________________________________________________________________
 
I WORKED FOR ENPPI
Position : PIPING DESIGNER
May 2001 – Mar. 2003
Participated in Several Petroleum & Industrial Projects
Tasks Accomplished Included:
·           Preparing Equipment Orientation & Piping (Vessels, Towers, Tanks, etc.).
·           Preparing Piping Routing for Networks.
·           Preparing Modeling.
·           Preparing Mechanical Drawings for Pump Stations.
·           Preparing Shop Drawings & Details.
·           Plot Plans.
·           Site Layouts.
·           Piping Plans.
·           Piping Isometrics & MTO.
_____________________________________________________________________________________
 
 
 
 
 
I WORKED FOR ABB petroleum
Position : PIPING DESIGNER & Sr. MECH. DRAUGHTSMAN
Apr. 2000 – Apr. 2001
Participated in ACPA project
Jobs Accomplished Included under & above ground:
·           Preparing Underground Oily Piping Design System.
·           Preparing Details.
·           Preparing Piping General Arrangement of Tanks Farm.
·           Preparing Piping Isometrics & MTO.
 
______________________________________________________________________________________
 
 
I WORKED FOR ZUHAIR FAYEZ Misr
Position: MECH. DRAUGHTSMAN
Jan. 98 - Apr. 2000
Participated in many of Electromechanical Projects
Tasks Accomplished Included:
·           Preparing DRAWING PLANS.
·           Preparing SECTIONS & DETAILS.
·           Preparing ISOMETRICS & MTO.
·           Preparing IRRIGATION SITE LAYOUTS.
 
______________________________________________________________________________________
 
 
I WORKED FOR SAUD CONSULT Misr
Position: MECH. DRAUGHTSMAN
Jan. 96 - Dec. 97
Participated in many of Electromechanical Projects
Tasks Accomplished Included:
·           Preparing DRAWING PLANS.
·           Preparing SECTIONS & DETAILS.
·           Preparing ISOMETRICS & MTO.
·           Preparing SHOP DRAWINGS.
·           Preparing 3D-DRAWINGS.
 
______________________________________________________________________________________
 
 
 
 
 
 
 
 
I WORKED FOR GARNO Misr
Position: PIPING, MECH. DRAUGHTSMAN
Jan. 95 - Dec. 95
Participated in KHARGA treatment stations
Tasks Accomplished Included:
·           Preparing DRAWING PLANS.
·           Preparing SECTIONS & DETAILS.
·           Preparing ISOMETRICS & MTO.
·           Preparing SHOP DRAWINGS.
·           Preparing 3D-DRAWINGS.
______________________________________________________________________
 
Time Before
I Worked For Different Companies As a Beginner Under Training.
 
______________________________________________________________________
 
 
 

Stats

Age: 54

Joined: July 7, 2012

Location

Egypt