About
Hi guys,
I hope all is well.
My name is Abdulwahab solkar. I live in Mumbai, india. i have done Bachelor Of Engineering in electrical. I have 3 years of Design Experience in Electrical Distribution Systems, Substation Design, Earthing and lightning protection system and lighting calculation for Industrial Plants of various nature like Oil and Gas, Petrochemical, Heavy Engineering Industries etc.
I have software proficiency in Autocad, Etap and Dialux and well Familiar with relevant national and international standards codes like IS, IEC, NFPA, IEEE, ANSI, NEC, NBC, OISD etc.
I am acquainted with electrical protection and metering philosophy, electrical layouts, equipment sizing and selection, hazardous area classification, Power System study including load flow, short circuit, highest motor starting, and relay co-ordination.
I had worked for various clients like Oil & Natural Gas Corporation Limited, Onshore Engineering Limited, and Hindustan Petroleum Corporation Limited etc.
If you have any query you can contact me at any time.
Thank you for your time and consideration.
Let’s find superior & economical electrical design solution.
Experience
-
Electrical Design Engineer
Jarzacon Engineering Consultants · Full-time
Dec 2018 –
Present
6 yrs
Mumbai, MH, India
1. Preparation of LV, MV, HV Single Line Diagram.
2. Familiar with relevant national and international standards codes - IS, IEC, NFPA, IEEE, ANSI, NEC, NBC, OISD etc.
3. Selection and sizing of various equipment (Based on fault level, protection, voltage drop calculation etc.)
4. General Electrical System Design for:
a) Earthing and Lightning Protection
b) Cable Routing
c) Cable Tray Sizing & Calculation
d) General Arrangement layout for electrical panel
5. Design Calculation for various Electrical Equipment
a) Transformer Sizing
b) APFC (Automatic Power Factor Correction )Panel Sizing
c) DG Sizing
d) NGR Sizing
e) LV, MV, HV Cable Sizing and BOQ.
f) Lighting Designing and Calculation on Dia lux
g) Earthing and Lightning Protecti on Sizing
h) Batter y Sizing
6. PMCC, PCC, MCC etc. Panel designing with metering and protection.
7. System Studies on ETAP and Calculation:
a) Load Flow Analysis
b) Short Circuit Calculation
c) Highest Motor Starting
8. Hazardous Area Classification
-
Electrical Engineer
Unity Controls pvt ltd · Full-time
Nov 2016 –
Dec 2018
2 yrs 1 mos
Mumbai, MH, India
1. Transformer size calculation .
2. Cable sizing and voltage drop calculation .
3. Capacitor bank sizing.
4. Preparation of SLD.
5. Busbar size calculation .
Education
-
Mumbai Univerisity
Bacholer of Engineering, Electrical , 6.82
2013 – 2016
-
Goverment Polytechnic Ratnagiri
Diploma, Electrical Engineer, 70
2010 – 2013