More than 10 years experience of designing of piping systems in 3D. Autocad/ Cadworx, PDMS. More than 4 years experience as Pipe stress engineer in CAESAR II.
Projects:
2020 – Expro s.r.o. – Static...
Read more
More than 10 years experience of designing of piping systems in 3D. Autocad/ Cadworx, PDMS. More than 4 years experience as Pipe stress engineer in CAESAR II.
Projects:
2020 – Expro s.r.o. – Static analysis of steam piping – Reconstruction of steam RCHS
2020 – Intech s.r.o. – Static and dynamic analysis of OVZ – Slovnaft a.s., unit 28
2020 – Intech s.r.o. – Static and dynamic analysis of OVZ – Slovnaft a.s., unit 25,45,44
and 54
2019 - OVZ - increasing reliability of OVZ pipeline - documentation for
construction_mechanical part, LPE, static and dynamic analysis of pipeline -
Slovnaft, a.s.
2019 - AVD6 - desalters replacement - documentation for construction_mechanical
part, static analysis of pipelines - Slovnaft, a.s.
2018/19 - AAG - production capacity increase, replacement of duplicator pipelines -
documentation for construction_mechanical part, static analysis of pipelines
Slovnaft, a.s.
2018 - SWAATS CW filtration - documentation for construction_mechanical part -
Slovnaft, a.s.
2018 - Diesel storage tank - documentation for construction_mechanical part - SAM -
SHIPBUILDING AND MACHINERY, a.s.
2018 - RHC - replacement of air filters - documentation for construction_mechanical
part - Slovnaft, a.s.
2018 - PYO - new storage tanks - static analysis of pipelines - Slovnaft, a.s.
2018 - NRN - new storage tank - static analysis of pipelines - Slovnaft, a.s.
2018 - AD5 - replacement of pump P7B - documentation for construction_mechanical
part, static analysis of pipelines, as built doc. - Slovnaft, a.s.
2017/18 - SWAATS - static analysis of pipe systems - Stercorat Hungary Kft.
2017/18 - SWAATS - documentation for construction, as built doc. _mechanical
part - Stercorat Hungary Kft.
2017 - HRP5 - replacement of exchangers pipelines - static analysis of pipe systems
2016 - Replacement of Waste Heat Boiler - documentation for
construction_mechanical part - Slovnaft, a.s.
2016 - TBA - flooding protection - documentation for construction_mechanical
part - Slovnaft, a.s.
2016 - Flowmeter replacement for Sulfenax - documentation for
construction_mechanical part - Duslo, a.s.
2016 - Increasing reliability of PU SAR_ESP filter - documentation for
construction_mechanical part - Slovnaft, a.s.
2015 - LDPE4 - AIR DOSING - documentation for construction_mechanical part -
Slovnaft, a.s.
2011/15 - Power plant Mochovce - Slovenské elektrárne, a.s.