<p class="MsoTitle" dir="RTL"><em>Sherif Mohamed Abd El-Nour Abd...
Read more
<p class="MsoTitle" dir="RTL"><em>Sherif Mohamed Abd El-Nour Abd El-Magid </em>
<strong>Piping Designer</strong>
<strong>Sr. Cad Designer</strong>
<strong> _________________________________________________________________________________</strong>
<strong>OBJECTIVE:</strong>
<strong>Seeking a Challenging Career in a Petroleum (Oil & Gas) or Construction Company Whereby My Designing and Drafting Background, Previous Work Experience, </strong>
<strong>and Managerial Skills can be Applied.</strong>
<strong>PERSONAL INFORMATION:</strong>
<strong>Date of Birth: 17-1-1970</strong>
<strong>Address: 20 Mohamed El-Sayed Hyba from Abu El-Fadel St., </strong>
<strong> El-Zawia El-Hamra, Cairo. Egypt.</strong>
<strong>Military Status: Finished</strong>
<strong>Marital Status: Married</strong>
<strong>Nationality: Egyptian</strong>
<strong>Religion: Moslem</strong>
<strong>EDUCATION:</strong>
<strong>Diploma of Industrial Technicality, Mataria Institute of Industrial Technique</strong>
<strong>Department: Mechanical</strong>
<strong>Graduation Date: May 1992</strong>
<strong>Overall Grade: Good</strong>
<strong>LANGUAGE SKILLS:</strong>
<strong>Arabic: Mother tongue</strong>
<strong>English: Very good command of both written and spoken</strong>
<strong>PROFESSIONAL SKILLS:</strong>
<ul>
<li><strong>Familiarity with International codes & standards.</strong></li>
</ul>
<ul>
<li><strong>18 YEARS EXPERIENCE IN THE FIELD OF MECH. WORKS DESIGN </strong></li>
</ul>
<strong> AND DRAFTING INCLUDES:</strong>
<ul>
<li><strong>EQUIPMENT ORIENTATION (following Data Sheets).</strong></li>
<li><strong>PIPING ROUTING (following P& ID's) FOR EQUIPMENT</strong></li>
</ul>
<strong>SUCH AS PRESSURE VESSELS, TANKS, TOWERS, </strong>
<strong>EXCHANGERS AND PUMPS.</strong>
<ul>
<li><strong>SITE LAYOUTS AND PLOT PLANS DRAWINGS.</strong></li>
<li><strong>PLANS, SECTIONS & DETAILS DRAWINGS.</strong></li>
<li><strong>SHOP DRAWINGS.</strong></li>
<li><strong>ISOMETRICS AND BILL OF MATERIALS.</strong></li>
<li><strong>MECHANICAL DRAWINGS FOR MACHINE ROOMS.</strong></li>
<li><strong>UNDERGROUND DRAINAGE NETWORKS.</strong></li>
<li><strong>TREATMENT STATIONS.</strong></li>
<li><strong>ANIMATION FOR MORE DETAILS AND REPRESENTATION.</strong></li>
</ul>
______________________________________________________________________________________
<strong>COMPUTER SKILLS:</strong>
· <strong>Very good Knowledge of Computer Hardware.</strong>
· <strong>Very good Knowledge of Various Operating Systems (DOS / Windows )</strong>
· <strong>Very good Knowledge of Many Applications Running Under </strong>
<strong>Microsoft Windows (Including Microsoft Office Applications).</strong>
· <strong>Very good Knowledge of </strong><strong>PDS</strong><strong> system.</strong>
· <strong>Very good Knowledge of </strong><strong>PDMS</strong><strong> system.</strong>
· <strong>Very good Knowledge of </strong><strong>Smartplant Review.</strong>
· <strong>Very good Knowledge of </strong><strong>ORTHOGEN.</strong>
· <strong>Very good Knowledge of </strong><strong>MICROSTATION Program (2D - 3D).</strong>
· <strong>Excellent Knowledge of </strong><strong>AutoCAD Program (2D - 3D).</strong>
· <strong>Very good Knowledge of </strong><strong>CADWorx Application.</strong>
· <strong>Good Knowledge of </strong><strong>AutoPLANT Application.</strong>
· <strong>Good Knowledge of </strong><strong>PlantSpace Application.</strong>
<strong>______________________________________________________________________________________</strong>
<strong>WORK EXPERIENCE</strong><strong>:</strong>
<strong>I WORK FOR</strong><strong>CB&I Lummus L.L.C.</strong>
Position<strong>: Sr. PIPING DESIGNER & LEAD CAD DESIGNER</strong>
Dec. 2010 – Present
Member of <strong>Reficar</strong> project design group
(<strong>PDS</strong>, <strong>ORTHOGEN, MicroStation</strong> & <strong>AutoCAD</strong>).
Tasks Accomplished Included:
· <strong>Preparing 3D-Equipment Models (following Data Sheets).</strong>
· <strong>Preparing 3D-Piping Models (following P&ID).</strong>
· <strong>Preparing Supports in Models for Stress Analyses review.</strong>
· <strong>Extract and Check ISO's.</strong>
· <strong>Coordinate with Process Dep. To reroute lines according to P&ID updates.</strong>
· <strong>Coordinate with Stress Analyses to achieve optimum supporting and routing as possible.</strong>
<strong>TEAM LEADER</strong>
Tasks Accomplished Included:
· <strong>Extract 2D by DRAWING MANAGER MODULE.</strong>
· <strong>PRODUCE DWG & DGN FORMATS WITH ORTHOGEN.</strong>
· <strong>FINISH AND COMPLETE 2D WITH FULL DATA AND DETAILS</strong>
<strong> by AutoCAD & MicroSTATION.</strong>
<strong>I WORKED FOR</strong><strong>CB&I Houston</strong>
Position<strong>: Sr. PIPING DESIGNER</strong>
July 2010 – Dec. 2010
Member of <strong>Reficar</strong> project design group (<strong>PDS</strong>, <strong>Microstation</strong> & <strong>AutoCAD</strong>).
Tasks Accomplished Included:
· <strong>Preparing 3D-Models by PDS (included P&ID and Data Sheets).</strong>
· <strong>Clash Check Reports.</strong>
· <strong>Extract ISO's</strong>
· <strong>Extract 2D with DWG & DGN formats by ORTHOGEN.</strong>
· <strong>FINISH DRAWINGS WITH FULL DATA AND DETAILS.</strong>
<strong>I WORKED FOR</strong><strong>CB&I Lummus L.L.C.</strong>
Position<strong>: Sr. PIPING DESIGNER </strong>
Aug. 2007 –July 2010
Participated in <strong>NAGARJUNA</strong> project (PDMS & AutoCAD).
Tasks Accomplished Included:
<p dir="RTL">Member of <strong>NAGARJUNA</strong> Project team, Participated in Preparing the Modeling as following:
<p dir="RTL">- Check Conditions for lines to update from latest Line List.
<p dir="RTL">- Check Clashes for lines to release it from Model.
<p dir="RTL">- Coordinate with Stress Analyses to achieve optimum
<p dir="RTL"> supporting and routing as possible.
<p dir="RTL">- Coordinate with Process Dep. To reroute lines according to
<p dir="RTL"> P&ID updates.
<p dir="RTL">- Coordinate with Instrumentation Dep. To update Sets and
<p dir="RTL"> Hook-Up’s.
<p dir="RTL">- Coordinate with Electrical Dep. To arrange locations of
<p dir="RTL"> Lighting Devices.
<p dir="RTL">- Extract ISO’s for Checking.
<strong>______________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong>HEAVY ENGINEERING INDUSTRIES AND</strong>
<strong>SHIPBUILDING CO. (K.S.C)</strong>
Position<strong>: PIPING DESIGNER </strong>
Apr. 2006 – Jun 2007
PARTICIPATE IN SEVERALJOBS FOR <strong>K.O.C</strong>
Tasks Accomplished Included:
· <strong>Preparing Equipment Orientation.</strong>
· <strong>Preparing Equipment Piping.</strong>
· <strong>Preparing Piping Routing. </strong>
· <strong>Preparing Pipelines Networks.</strong>
· <strong>Preparing Mechanical Drawings & Details.</strong>
· <strong>Plot Plans.</strong>
· <strong>Site Layouts.</strong>
· <strong>Piping Plans & Sec's.</strong>
· <strong>Piping Isometrics & MTO.</strong>
· <strong>3D View Perspective.</strong>
· <strong>Modeling & ISOgen.</strong>
<strong>____________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong>SIEMENS</strong><strong> Industrial Solutions and Services</strong><strong>.</strong>
Position<strong>: PIPING DESIGNER </strong>
Sep. 2004 – Mar. 2006
Participated in <strong>EAST DELTA </strong>piping treatment project
And other Electromechanical Projects
Tasks Accomplished Included:
· <strong>Preparing Mech. & Piping Works. </strong>
· <strong>Preparing SECTIONS & DETAILS.</strong>
· <strong>Preparing ROUTING OF PIPING NETWORKS.</strong>
· <strong>Preparing ISOMETRICS & MTO.</strong>
· <strong>Preparing SHOP DRAWINGS.</strong>
<strong>______________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong>SAUD CONSULT EL</strong><strong> KHOBAR.</strong>
Position<strong>: CAD SUPPORT </strong>
Mar. 2003 – Feb. 2004
Participated in <strong>KHAFJI </strong>project for<strong>ARAMCO</strong>
Tasks Accomplished Included:
· <strong>Preparing DRAWING PLANS. </strong>
· <strong>Preparing SECTIONS & DETAILS.</strong>
· <strong>Preparing ISOMETRICS & MTO.</strong>
· <strong>Preparing SHOP DRAWINGS.</strong>
· <strong>Repairing and Converting for DGN & DWG files.</strong>
· <strong>Trainer ( MicroStation ).</strong>
<strong>______________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong>ENPPI</strong>
Position<strong>: PIPING DESIGNER </strong>
May 2001 – Mar. 2003
Participated in Several Petroleum & Industrial Projects
Tasks Accomplished Included:
· <strong>Preparing Equipment Orientation & Piping (Vessels, Towers, Tanks, etc.).</strong>
· <strong>Preparing Piping Routing for Networks.</strong>
· <strong>Preparing Modeling.</strong>
· <strong>Preparing Mechanical Drawings for Pump Stations.</strong>
· <strong>Preparing Shop Drawings & Details.</strong>
· <strong>Plot Plans.</strong>
· <strong>Site Layouts.</strong>
· <strong>Piping Plans.</strong>
· <strong>Piping Isometrics & MTO.</strong>
<strong>_____________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong>ABB</strong><strong>petroleum</strong>
Position<strong>: PIPING DESIGNER & Sr. MECH. DRAUGHTSMAN</strong>
Apr. 2000 – Apr. 2001
Participated in <strong>ACPA</strong> project
Jobs Accomplished Included under & above ground:
· <strong>Preparing Underground Oily Piping Design System.</strong>
· <strong>Preparing Details.</strong>
· <strong>Preparing Piping General Arrangement of Tanks Farm.</strong>
· <strong>Preparing Piping Isometrics & MTO.</strong>
<strong>______________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong> ZUHAIR FAYEZ Misr</strong>
Position:<strong> MECH. DRAUGHTSMAN</strong>
Jan. 98 - Apr. 2000
Participated in many of Electromechanical Projects
Tasks Accomplished Included:
· <strong>Preparing DRAWING PLANS.</strong>
· <strong>Preparing SECTIONS & DETAILS.</strong>
· <strong>Preparing ISOMETRICS & MTO.</strong>
· <strong>Preparing IRRIGATION SITE LAYOUTS.</strong>
<strong>______________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong>SAUD CONSULT Misr</strong>
Position:<strong>MECH. DRAUGHTSMAN</strong>
Jan. 96 - Dec. 97
Participated in many of Electromechanical Projects
Tasks Accomplished Included:
· <strong>Preparing DRAWING PLANS.</strong>
· <strong>Preparing SECTIONS & DETAILS.</strong>
· <strong>Preparing ISOMETRICS & MTO.</strong>
· <strong>Preparing SHOP DRAWINGS.</strong>
· <strong>Preparing 3D-DRAWINGS.</strong>
<strong>______________________________________________________________________________________</strong>
<strong>I WORKED FOR</strong><strong> GARNO Misr</strong>
Position:<strong> PIPING, MECH. DRAUGHTSMAN</strong>
Jan. 95 - Dec. 95
Participated in <strong>KHARGA</strong> treatment stations
Tasks Accomplished Included:
· <strong>Preparing DRAWING PLANS.</strong>
· <strong>Preparing SECTIONS & DETAILS.</strong>
· <strong>Preparing ISOMETRICS & MTO.</strong>
· <strong>Preparing SHOP DRAWINGS.</strong>
· <strong>Preparing 3D-DRAWINGS.</strong>
<strong>______________________________________________________________________</strong>
<strong>Time Before </strong>
<strong>I Worked For Different Companies As a Beginner Under Training.</strong>
<strong>______________________________________________________________________</strong>