Group Leader
LLC “SMART ENGINEERING · Full-time
Jul 2023 –
Present
1 yrs 6 mos Tyumen, Tyumen Oblast, Russia
— Resource management;
— Labor hours estimation;
— 3D modeling (Revit, Autocad Plant 3D);
— BIM management;
— Developing work process philosophies (work documentation
release);
— Implementing engineering design tools;
— Engineering networks design (heating, water, gas supply,
ventilation, air conditioning, compressed air systems);
— Designing electrical heating systems for permafrost grounds;
— Strength calculation of pipelines;
— Solving atypical pipeline and equipment heating issues.
Achievements:
1. Formed the Installation Design department (staff of 8 people);
2. Implemented BIM modeling in the organization (Revit, Autocad Plant 3D) - eliminated network collisions in projects and increased the release rate of RD by more than 40%.
3. Implemented a standard control program in the organization – improving the quality of products from 43% to 96%;
4. Developed internal philosophies for the work of the department, paperwork and interdisciplinary interactions.
Design engineer of the 1st category
PJSC SIBUR · Full-time
Nov 2019 –
Jun 2022
2 yrs 7 mos Tyumen, Tyumen Oblast, Russia
Responsibilities:
— Participation in collecting initial data on the design object.
— Combining technical solutions of varying complexity with related disciplines.
— Making decisions on heat and energy consumption.
— Participation in inspection and acceptance of documentation.
— Author's supervision of projects.
— Coordination of main technical solutions for complex objects (calculations, diagrams, plans, etc.).
— Thermal and aerodynamic calculation of heat engineering equipment.
— Equipment selection.
— Coordination of design documentation.
— Design of the heat and mechanical principle diagram of the boiler house.
— Technical and economic calculations of equipment.
— Design of Thermal insulation of pipelines and equipment sections.
— Design of Electric heating of pipelines and equipment sections.
Achievements:
1. Achieved a higher than expected KPI of 135%;
2. Tools have been introduced to increase the speed of manufactured project products by automating processes (processing of initial data and the release of finished BOM, BOQ are carried out in a single window mode).
3. Defects in the existing methods of calculating thermal insulation have been corrected.
4. Improvement of the thermal insulation calculation tool and electric heating systems.
Head of the HVAC and Plumbing Group
PKTI "Promtekhproekt" · Full-time
Jan 2019 –
Nov 2019
10 mos Tyumen, Tyumen Oblast, Russia
— Development of engineering documentation related to heating, ventilation, and air conditioning (HVAC).
— Participation in gathering initial data for design projects.
— Supervision of the detailed development of accepted technical solutions.
— Coordination of technical solutions of varying complexity with related disciplines.
— Decision making regarding heat and energy consumption.
— Preparation of explanatory notes for the "PD" stages.
— Participation in inspection and acceptance of documentation.
— Author's supervision of projects.
Approval of major technical decisions for complex projects (calculations, diagrams, plans, etc.).
— Thermal and aerodynamic calculations of thermal equipment.
— Equipment selection.
— Coordination of project documentation.
— Design of the thermal-mechanical schematic diagram of the boiler room.
— Design of the heat energy consumption metering point.
— Design of the fuel consumption metering point.
— Technical and economic calculations of equipment.
Completion of military service by conscription
Military unit 58661-93 · Full-time
Dec 2017 –
Dec 2018
1 yrs Tyumen, Tyumen Oblast, Russia
— Certificate of appreciation for good service.
— A letter of thanks to the mother for the service of the defender of the Fatherland.
heating engineer
JSC Tyumen-Diesel · Full-time
Jun 2015 –
Dec 2017
2 yrs 6 mos Tyumen, Tyumen Oblast, Russia
— Thermal and aerodynamic calculation of thermal equipment.
— Equipment selection.
— Coordination of project documentation.
— Design of the principal heat-mechanical scheme of the boiler house.
— Design of the thermal energy consumption metering point.
— Design of the fuel consumption metering point.
— Technical and economic calculations of equipment for block-modular boiler projects.
— Calculations of the heating and ventilation system.
— Design of the heating and ventilation system.
— Development of technical specifications.
— Development of operating instructions.
— Preparation of technical specifications, working with projects and conducting tenders for the execution of engineering systems for the complex.
— Working with companies providing technical maintenance services for objects.
— Participation in inspections conducted by state supervision authorities, inspections, and commissions.
— Selection of water treatment installations for boiler houses.
— Calculation of heat exchange equipment.
— Verification calculations and design of boilers up to 6 MW.
Education
Tyumen Industrial University
Master's Degree, Industrial thermal power engineering and Thermal Engineering"
2019 – 2031
(expected)