Global rank:
92,249 / 94,910
Skill pts: 0
2D AutoCAD 2D Drawings 2D/3D AutoCAD Adobe Acrobat Pro AutoCAD CAD Design CAD Drawing Google Sketchup Microsoft Excel Microsoft Office Microsoft Outlook Microsoft Windows Microsoft Word Ubuntu

About

Personal Summary

I am an experienced Technical Project Installation & Maintenance Manager and Senior Hardware Project Engineer with expertise in executing Electronic Tolling System projects in Malaysia, Thailand, and Indonesia. My core competencies include project systems installation, computer networking, CCTV systems, electronic tolling collection systems, and MLFF systems. I am skilled in creating AutoCAD drawings, designing electronic systems, and troubleshooting sensors. I ensure optimal system performance, budget control, and equipment reliability through preventive maintenance. Additionally, I implement safety policies and liaise with vendors for cost-effective maintenance solutions, always focusing on delivering exceptional customer service.

Experience

  • R & D ENGINEER ACES Electronic Sdn. Bhd. · Full-time Feb 2000 – Feb 2025 25 yrs Malaysia • Circuit Design: Designed circuits using Protel software, ensuring optimal performance for electronic ballasts and lamps
    • Product Modelling: Utilizing AutoCAD software, created models for ballasts and lamps, emphasizing innovative design
    • Prototyping and Standards: Constructed new model prototypes, meticulously matching electronic component parameters to IEC standards
    • Checked and tested product electronic parameters, ensuring quality and reliability
    • Operational Efficiency: Actively contributed to enhancing production efficiency, ultimately boosting operational profitability
  • Maintenance Manager Q-Free Bangkok · Full-time Jul 2013 – Dec 2024 11 yrs 5 mos Thailand • Created shift schedules for the maintenance teams.
    • Managed scheduled and unscheduled maintenance with minimal downtime.
    • Trained and supervised the maintenance staffs.
    • Supported maintenance teams in both Corrective and Preventive Maintenance, ensuring optimal system performance and budget control.
    • Improved spare parts management by identifying key items and setting stock levels based on use.
    • Enhanced equipment efficiency and reliability through preventive maintenance and repair scheduling.
    • Established and enforced workplace safety policies.
    • Coordinated with external vendors and service providers for maintenance equipment and cost control.
  • Technical Project Installation & Maintenance Manager Q-Free · Full-time Jul 2013 – Dec 2024 11 yrs 5 mos Thailand Technical Project Installation Manager:
    • Studied the Project TOR and prepared schedule/planning documentation for installation projects with the project team.
    • Collaborated with sub-contractors, suppliers, customers, and consultants to track project progress.
    • Assisted in developing project prototype systems and performed end-user testing of new tools and project management systems for client demonstrations.
    • Managing an installation project teams, allocating tasks, and ensuring efficient workflow to complete the projects installation on time.
    • Oversaw installation and implementation of key systems, including Electronic Tolling Systems (ETC), MLFF, Networking, Electrical Power, Cabling, CCTV/ALPR Systems, and DSRC communication.
    • Focused on safety and reliability during installations, following System Logic Design.
    • Created AutoCAD Shop Drawings and As-Built Drawings for reference and submission to customer and consultant.
    • Worked with store management to resolve project management issues involving internal store team members, contract installers, and vendors.
    • Act as a liaison between customers, contractors and sales team to provide the better installation experience as possible.
  • Technical Manager & Hardware Project Engineer Q-Free (Malaysia) Sdn. Bhd. · Full-time Jul 2003 – Jul 2013 10 yrs Malaysia • Project Management and Communication: Conducted project progress meetings with stakeholders, including customers, consultants, sub-contractors, and suppliers
    • Enhanced project completion rates through effective communication and collaboration
    • Team Leadership and Delegation: Planned and delegated tasks to team members, ensuring efficient project progress
    • Monitored project milestones and performance
    • Technical Training and Documentation: Trained technical team based on project drawings and reports
    • Prepared essential documents, including Bill of Materials (BOM)/Bill of Quantities (BOQ), Quotations, and Internal Purchase Orders (IPO)
    • Relationship Building and Follow-Up: Maintained constant communication with project team manager
    • Regularly followed up with suppliers and contractors to ensure timely task completion
    • Successful Installation: Ensured system equipment was installed successfully, achieving high installation rate
    • Prepared efficient installation processes, minimizing project delays and costly modifications
    • Safety and Reliability: Developed procedures with focus on safety, reliability, and efficiency.
    • Installed and tested networking systems, ensuring seamless communication between Electronic Equipment Systems
    • Electrical & Electronic Expertise: Designed and tested electrical & electronic tasks related to voltages, currents, cable specifications & electronic equipment system
    • Supervised project installation team, maintaining quality standards
    • Design and Documentation: Created AutoCAD wiring diagrams, Shop Drawings, and As-Built Drawings for project system equipment which served as references and delivered to customers and consultants
    • Built strong relationships with clients/customers.
  • R & D ENGINEER ACES Electronic Sdn. Bhd. · Full-time Feb 2000 – Feb 2002 2 yrs Malaysia • Circuit Design: Designed circuits using Protel software, ensuring optimal performance for electronic ballasts and lamps
    • Product Modelling: Utilizing AutoCAD software, created models for ballasts and lamps, emphasizing innovative design
    • Prototyping and Standards: Constructed new model prototypes, meticulously matching electronic component parameters to IEC standards
    • Checked and tested product electronic parameters, ensuring quality and reliability
    • Operational Efficiency: Actively contributed to enhancing production efficiency, ultimately boosting operational profitability

Education

  • Sheffield Hallam University Bachelor's Degree, Engineering, Electronic & Electrical Engineering 1999 – 2000
  • Tunku Abdul Rahman College Advanced/Higher Diploma, Engineering, Electronic & Electrical Engineering 1998 – 2000
  • Tunku Abdul Rahman College Diploma, Engineering, Electronic & Electrical Engineering 1996 – 1998
  • Tunku Abdul Rahman College Certificate, Engineering, Electronic Engineering 1994 – 1996

Other experience

  • Completed and acheievement of Projects • The Cheras-Kajang Highway. (Malaysia)
    • The East Coast Expressway (ECE). (Malaysia)
    • The KL-Karak Highway (KLK). (Malaysia)
    • The Highway of Southern Outer Bangkok Ring Road (SOBRR)(Thailand).
    • Upgraded of the Sri Rat Expressway (Thailand).
    • The Project in Jakarta (worked with Australia Project Team).
    • The Don Mueang Toll Way (Thailand) – Existing Project