About
Highlights of Qualifications:
• More than 43 years of experience in drafting of various structures in dam construction projects
• Experienced in the design of excavation in the rock and alluvium (dam foundation, side spillway),
• Qualified in the design of horizontal, peripheral galleries, access to the relevant structures inside dam body
• Fellow technician in various dam construction projects (study and construction projects)
• Well-versed in the provision of 3D drawings of dam body and the appurtenant structures,
• Skilled at drafting based on 3D models
• Quantity survey
Experience
-
Senior draftsman
Mahab Ghodss Consulting Engineering Company-MGCE · Full-time
Jul 1982 –
Apr 2019
36 yrs 9 mos
Tehran, Tehran Province, Iran
Activities Performed:
• Preparation and control of Karun III Dam drawings (Phase I, II, III)
• Preparation and control of Karun IV Dam drawings (Phase I, II)
• Preparation and control of Bakhtiari Dam drawings (Phase I)
• Preparation and control of Reiss-Ali Delvari Dam drawings (Phase II, III)
• Preparation and control of Nosood Tunnel drawings (Phase III) and preparation of 3D digital model of the whole project
• Preparation and control of following projects' drawings:
KOOHRAND DAM , JEGIN DAM, ARIUBARZAN REGULATING DAM, KARKHEH REGULATING DAM (PAY-E-POL), SEYMAREH DAM, SALMAN-E-FARSI DAM, SHAFAROOD DAM, SHAHID RAJAEE DAM, PANZDAHE-KHORDAD DAM, ALAVIAN DAM, TALEGHAN DAM, OSTOUR DAM, RAMHORMOZ DAM, ABSHINEH DAM, CHAM GERDALAN DAM, SHIRVAN DAM, KARUN II DAM, REHABILITATION OF OLD FARIMAN DAM, HAVASAN DAM, KHERSAN I, II, III DAM, SAZBON DAM, EMARAT DAM, TANG-E-MASHOREH DAM, RAMIN DAM, BELBAR DAM, EMAM HASSAN DAM, CHAMSHIR DAM, UMA OYA DAM, HIRVI DAM,
• Preparation and control of Maroon, pay-e-pol powerhouses drawings
• Preparation of 3D digital model of GHIZ GHALE CI Powerhouse and drafting based on 3D model.
• Preparation of 3D digital model of ARAS Powerhouse (Iran side) and drafting based on 3D model.
• Preparation of drawings related to power intake, bottom outlet, drinking intakes, side spillways, crest spillway and plunge pool
Other experience
-
Preparation and control of Karun III Dam drawings (Phase I, II, III)