Global rank:
85,921 / 86,038
Skill pts: 0
(HAP) Hourly Analysis Program 2D AutoCAD 2024 CAD Design Design Engineer Design Engineering Elite Fire Engineering Design Fire Fighting Fire Protection Design HVAC Calculation Design HVAC Design HVAC Draftsman & Calculation HVAC and Plumbing Plumbing CAD Plumbing Engineering Plumbing Risers Design Plumbing System Design Rivet 2022 fire rated systems
Invite

About

HVAC:
1. Utilizes a CAD to prepare HVAC design drawings CAV&VAV utilizing theoretical and practical design knowledge. Interprets and ensures conformance to standards and codes, as well as company policies and procedures. Understands and utilizes applicable software for load calculation.
2. Writing engineering reports.
3. Supervising and directing the site work.

PLUMBING:
1. Design Engineering, analysis and quality control of process piping, chilled water systems, and plumbing.
2. Writing engineering reports.

FIREFIGHTING:
1. Engineering, Design of firefighting (Industrial & Commercial) systems as NFPA standard and authority civil defense required
2. Writing engineering reports.

Experience

  • Projects Manager 5TH Element Construction Company · Full-time Mar 2015 – Present 9 yrs 6 mos 6th of October City, Giza Governorate, Egypt Projects:
    Villas, Factories, Malls, Hospitals
  • Projects Manager Energy & Construction Company · Full-time Sep 2015 – Feb 2024 8 yrs 5 mos Riyadh, Riyadh Province, Saudi Arabia Projects:
    1-Obair Valley Resort.
    (200 Villas, Hotel, Club House, Nursery, Mosque & Utility Buildings)
    2-Ellehpi medical center.
    Dialysis center (50 beds, 50 dialysis machine, 2 RO systems, Clinics (
    3-Villas, Palaces & Hotels.
  • HVAC, Firefighting & Plumping Design Engineer Q.DESIGN Consulting Multinational Company · Full-time Sep 2015 – Jun 2016 9 mos undefined, Cairo Governorate, Egypt Projects:
    All Projects in KSA (Malls, Hospitals, Commercial & Residential buildings).
  • Supervisor Engineer SALEH& HEGAB Consulting Company · Full-time May 2015 – Sep 2015 4 mos undefined, Cairo Governorate, Egypt Elrehap compound (Buildings, Club House, Mosque)
  • Technical, Installation & site Engineer EGEMECH Execution Company · Full-time Sep 2013 – May 2015 1 yrs 8 mos undefined, Cairo Governorate, Egypt Projects:
    1-Mall of Egypt, VENTILATION SYSTEM.
    2-Porto Cairo mall, WATER CHILD SYSTEM + VENTILATION SYSTEM.
    3-Office building of AGRIMATCO Company, VRV SYSTEM.
  • Design Engineer SALEH& HEGAB Consulting Company · Full-time Jun 2013 – Sep 2014 1 yrs 3 mos undefined, Giza Governorate, Egypt HVAC, Firefighting & Plumping Design Engineer

    Projects:
    1-Factory of medicine (ADWYA), WATER CHILD SYSTEM + FIRE FIGHTING.
    2-Factory of medicine (MERAGE), WATER CHILD SYSTEM + FIRE FIGHTING.
    3-Canadian university (6 October), WATER CHILD SYSTEM + FIRE FIGHTING.
    4-Compound of villa (FIFTH GROUP), DX SYSTEM.
    5-Office building of SHLUMBERJER Company, WATER CHILD SYSTEM + FIRE FIGHTING.
    6-Group factory of medicine (AKMA), WATER CHILD SYSTEM + FIRE FIGHTING.

Education

  • Faculty of Engineering & Energy 85%, Mechacnical Engineering, Good 2005 – 2012