About
Eng. Islam Saudi is a Structural Engineer with about 11 years of experience in design of
projects including underground metro, water and wastewater plants,high rise buildings,repairing of structures and precast building.
Eng. Islam gained great experience in the analysis and design of RC structures practicing various worldwide building codes
including the ACI, BS Codes of Practice, Eurocode and Egyptian Code (ECP),
Eng. Islam gained great experience in following programs
- PLAXIS; Finite Element Code for Soil and Rock Analysis including the retaining
structural elements.
- SAP 2000; Structural Analysis Program.
- SAFE; Slab Analysis by the Finite Element Method
- ETABS; Extended 3D Analysis of Building systems
- PROKON, PCA-COL
- CONCISE BEAM, Analysis and design of precast prestressed elements (beams,HCS)
- Microsoft office; MS Excel, MS Word, MS Power Point.
- AutoCAD
- Revite structure
-Concise Beam
Experience
-
Senior Structural Engineer
MC CONSULTANT · Full-time
Sep 2014 –
Present
10 yrs 2 mos
undefined, Giza Governorate, Egypt
1-LUSAIL TOWER (Qatar) 3 basements, ground & 26 floors-2-ARABILLA MALL (Egypt) 4 basements, ground & 5 floors-3-MAHER TOWER (Egypt) basement, ground & 11 floors-4-NAJJADA TUNNEL (Qatar)-5-MONUMENTS RESTORATION (QAITBAY AGENCY and OLD CAIRO FENCE)-6-THE TECHNOLOGY ZONE IN BORG ALARAB AND NEW ASSIUT CITY (EGYPT)-7-some buildings in an army club in NEW ADMINISTRATIVE CAPITAL (EGYPT)-8-KING SALMAN UNIVERSITY (ALTOR AND SHARM ELSHIKH -EGYPT)-9-EL GALALA UNIVERSITY (EL GALALA CITY- Suez-EGYPT)-10-fancy food factory (6 October city –Geza- EGYPT )-11-Viva paper factory (6 October city –Geza- EGYPT )-12-new constructions and repairing of ancient in monumentspresidential palaces (Cairo and Alexandria –EGYPT)-13-Precast buildings (Qatar)
-
Structural Design Engineer
TASAMIM (HAIL, KSA) · Full-time
Jul 2011 –
Aug 2014
3 yrs 1 mos
Hail, Hail Province, Saudi Arabia
Design and supervise on construction more than 200 buildings (villas, mosques and residential)
-
Structural Design Engineer
EC-MISR · Full-time
Jul 2008 –
Jul 2011
3 yrs
Cairo, Cairo Governorate, Egypt
*Participate in full design in projects below.
1-Greater Cairo Metro Project - Line 3 - Phase 3 ,Zamalek , Imbaba Underground Stations and underground Annexed Structures between Zamalek Station and Maspero Station.
2-The Optimization of the 1st Stage of Waste Water Treatment Plant in GABAL EL ASFAR
*Participate in reviewing of projects below.
1-Al Sofooh Tram Line, Dubai, UAE
2-Dubai Metro Project
Education
-
Shoubra Faculty of Engineering, Benha University, Egypt
Bachelor , civil-structural, good
2003 – 2008