About
Hello, I am Mohammad Ade Leo Lafif , and I work as a BIM Engineer for the PT. Adhi Karya (Persero) Tbk. My work deals with comprehensive BIM solutions from 3D to 8D. Whether it's 3D modeling, clash detection, shop drawings, Quantity Take off, Video Animation Project, 4D scheduling, 5D cost estimation, 6D energy analysis, or 7D facility management, 8D for As Build Drawing, and BIM CDE 360 Docs to collect and control document. I collaborate with a team of architects, structural engineers, MEP designers, and other project stakeholders to get the job on-time and with strict adherence to project deadlines.
3D Models
See more
Experience
-
Project of Road Handling and Bridge Toapejat – Rokot – Sioban (Simp. Logpon)
ADHI-MAK, KSO · Contact
Nov 2022 –
Present
2 yrs 3 mos
undefined, West Sumatra, Indonesia
Scope of Work :
❖ Plan and make work drawings to facilitate implementation in the field.
❖ Calculate the Quantity of each Work Item
❖ Make Implementation and Time Management
❖ Create Project Quality Management
❖ Make a Monthly Report on BIM Implementation
❖ Coordinate with the team using 3D models, 4D Schedule and 5D Cost.
❖ Create an Animated Video and BIM Campaign
-
Project of Construction of Mentawai New Airport
ADHI-MAK, KSO · Contact
Dec 2020 –
Nov 2022
1 yrs 11 mos
undefined, West Sumatra, Indonesia
Scope of Work:
❖ Plan and make work drawings to facilitate implementation in the field.
❖ Calculate the Quantity of each Work Item
❖ Make Implementation and Time Management
❖ Create Project Quality Management
❖ Make a Monthly Report on BIM Implementation
❖ Coordinate with the team using 3D models, 4D Schedule and 5D Cost.
❖ Create an Animated Video and BIM Campaign
-
Project of Design and Built a Drinking Water Supply System with a Capacity of 450 Lpd
PT. ADHI KARYA (Persero) Tbk · Contact
Apr 2019 –
Dec 2020
1 yrs 8 mos
Dumai, Riau, Indonesia
Scope of Work:
❖ Plan and make work drawings to facilitate implementation in the field.
❖ Calculate the Quantity of each Work Item
❖ Make Implementation and Time Management
❖ Create Project Quality Management
❖ Make a Monthly Report on BIM Implementation
❖ Coordinate with the team using 3D models, 4D Schedule and 5D Cost.
❖ Create an Animated Video and BIM Campaign
-
Project of Installation of Box Girder on Flyover MBK 6
PT. ADHI KARYA (Persero) Tbk. · Contact
Jun 2018 –
Apr 2019
10 mos
Medan, North Sumatra, Indonesia
Scope of Work:
❖ Plan and make work drawings to facilitate implementation in the field.
❖ Calculate the Quantity of each Work Item
❖ Make Implementation and Time Management
❖ Create Project Quality Management
❖ Make a Monthly Report on BIM Implementation
❖ Coordinate with the team using 3D models, 4D Schedule and 5D Cost.
❖ Create an Animated Video and BIM Campaign
Education
-
Universitas Semarang
Sarjana Teknik, Civil Enginer, 3.35
2014 – 2017
Activities and Societies:
training of Autocad and SAP 2000 to construction
Evaluation and Monitoring of Works